North of Germany

In the north of Germany we faced the challenge of moving the machine machine motor with the weight of 60 tons. To make things more complicated, the machine was located in the basement.

We managed to lift the machine with the synchronised, hydraulic crane and then we moved it with the help of our skidding systems and hydraulic cranes to successfully get the machine out of the hall.


More projects

Gorenje 2015

In Gorenje we faced a pressing machine with the weight of 50 tons, which needed to be placed into working position. Firstly we used the appropriate crane to ...

Read more

Austrian Ironworks

An Austrian Ironwork hired us to lift the frame of a press machine to the height of 3 metres. For the lift we used the synchronised hydraulic crane and we ...

Read more